Case Studies

Turner House - Jigsaw Homes

Hayman was appointed to deliver a full boiler house installation at Turner House, a project specified by a consultant to upgrade the heating system for an office block housing over 100 employees. Managing the project from start to finish, our team handled every stage, from pre-start planning to final handover, ensuring a seamless installation. The new system was designed to provide reliable and efficient heating, meeting the demands of a high-occupancy workspace. This project exemplifies Hayman’s expertise in full end-to-end management, delivering tailored solutions that enhance workplace comfort and operational efficiency.

Gas Fire Heater Installation - Wigan Council

During a routine planned service, the existing gas-fired heater at a Wigan Council sports hall was condemned due to safety concerns and the unavailability of replacement parts. With repair no longer an option, the client opted for a full heater replacement. However, upon assessment, Hayman identified that the existing gas line was undersized and unsuitable for the new installation. To ensure optimal performance and compliance with safety regulations, our team installed a new, correctly sized gas supply before fitting the new gas-fired heater. This upgrade restored reliable heating to the sports hall, providing a comfortable environment for users while enhancing energy efficiency and system longevity.

Tanfield Close Heater Installation - Wigan Council

Following complaints about cold conditions in the main hallways at Tanfield Close, Hayman was tasked with providing an effective heating solution for these challenging areas. With no suitable gas supply available for a wet system, our team assessed the existing electrical infrastructure and developed a plan to install LVT heaters. Working closely with Dimplex, a market leader in heating solutions, we designed a system to ensure adequate and efficient heat distribution throughout the corridors. Our electrical team carried out the installation, upgrading mains distribution and circuitry while also removing ineffective over-door heaters. This project showcased Hayman's ability to adapt to site constraints and deliver practical, energy-efficient heating solutions.

Our Case Studies


Get In Touch

To request a call back please use our contact form

© Hayman 2025